Easy Installation

To ensure a flat surface the steel deck may require leveling before laying the TNF floor units.

The units are laid in staggered rows. The layout of the units should start at a corner.

Due to the characteristics of the mineral wool, minor inequalities of the deck surface may be taken up by the floor units.

The units are easily cut by an angle grinder or similar.

The units are tack welded together on all edges per every 300 mm.